BRIME
BRIdge
Management in Europe
DELIVERABLES
There
will be fourteen deliverables for the project.
- D1
Review of current procedures for assessing load carrying capacity (WP2).
- D2
Review of current practice for assessing the condition of bridges and
classification of defects (WP1).
- D3
Review of existing procedures for optimisation (WP6).
- D4
Review of existing bridge management systems and definition of the functions,
inputs, modules and format of the proposed bridge management system
(WP7).
- D5
Development of models for material strength and traffic loading (WP2).
- D6
Review of experimental methods and reliability techniques for assessing
the load carrying capacity of bridges (WP2).
- D7
Review of methods for deciding whether to repair, replace or strengthen
a bridge, and report on the factors to be considered as a basis for
development of a European decision making system (WP5).
- D8(as
a pdf or a
zip file) Bridge management and condition monitoring (WP4).
- D9 Review of the use of neural networks for the classification of defects
and guidelines for quantifying the condition of concrete bridges (WP1).
- D10
Guidelines for assessing load carrying capacity (WP3).
- D11
Recommendations for the modelling of deterioration for the assessment
of bridge strength (WP3).
- D12
Development of procedures for determining the adequacy rating and guidelines
for prioritisation of bridge maintenance (WP6).
- D13
Outline framework for the proposed bridge management system (WP7).
- D14
Final report (1/11/2002)
D14 Appendix III
All
of the deliverables will be publicly available.
|