TRL - Creating the future of transport
    

Home > Online Store > Reports & Publications > TRL Reports > Highways Reports > Reducing congestion on the road network: Part 2 Use of temporary backfill

Reducing congestion on the road network: Part 2 Use of temporary backfill


The use of temporary backfill in road or street works as an ‘immediate reinstatement’ could provide benefits in terms of enabling the road to be opened during peak periods and actual works confined to off peak periods such as weekends. Trials using commonly available granular materials (Type 1, Sharp Sand and Pea Shingle) with a thin asphalt surface course were undertaken in a large 2m by 2m opening and trafficked under accelerating loading conditions using the TRL Pavement Test Facility. The results demonstrated that several options could provide a temporary running surface that could be trafficked for several days. This is an option that should be considered at the planning stage of any works. The use of temporary backfill in an opening immediately adjacent to the carriageway to maximise the number of running lanes is also considered. The report also examines the cost benefits to be gained.

Author I Carswell, RW Jordan, C Sadat-Shafaee Pages 45
Date 19/04/2013 Reference PPR655
ISBN 978-1-908855-48-0 ISSN 0968-4093



Expert Witness
Specialists in the forensic investigation of road traffic incidents.
Participants Wanted
Help TRL with its research.
Child Safety Centre
An authority on the safety of children in vehicles.
Transport News Hub
The place for independently supplied national and international Transport News.